Ocean surface

Project & Heavy-Lift Cargo

Project & Heavy-Lift Cargo

Moving Oversized Equipment Without Surprises

Project and heavy-lift consignments carry risk that ordinary cargo does not. A single incorrectly rated lashing arrangement or an underestimated sea state can put a multi-million-riyal unit — and the vessel carrying it — in jeopardy.

We review and approve lashing and securing arrangements, attend the lift and stowage operations, and assess the transport plan against the sea conditions expected on the intended voyage.

Heavy-lift crane over a vessel

100%

Plans Reviewed

Lashing, Securing and Voyage Risk

Approval of securing arrangements is issued only after the calculation, the materials and the actual execution on deck have all been checked against the expected forces of the passage.

Marine survey attendance in dry dock

Lashing & Securing

Review and approval of lashing calculations, materials and executed arrangements.

Lift Attendance

Presence during lifting and stowage operations of oversized and heavy units.

Weight & Dimension Check

Verification of declared weights, dimensions and centre of gravity before loading.

Voyage Risk Assessment

Assessment of the transport plan against expected sea and weather conditions.

Stowage Planning Review

Technical review of stowage plans for structural and stability implications.

Damage Prevention

Identification of the risks most likely to cause damage in transit, before departure.

Need this survey arranged?

Tell us the vessel or consignment, the port and the scope you need. We will confirm a surveyor and a written quotation before any attendance.